KOBELCO 7250 PDF

Crane chart and more information about the Kobelco Bigge may have Kobelco in its fleet for sale or rent. Contact us by phone, email or chat. Global Official Website of Kobelco Construction Machinery,a leading company of S. Main Specifications. General Dimensions. Catalog Download. S. CONTENTS. 3 SPECIFICATIONS. 5 GENERAL DIMENSIONS. 7 BOOM AND JIB ARRANGEMENTS. 11 WORKING RANGES. 16 SUPPLEMENTAL.

Author: Akill Kem
Country: Mexico
Language: English (Spanish)
Genre: Science
Published (Last): 26 June 2013
Pages: 419
PDF File Size: 6.35 Mb
ePub File Size: 15.90 Mb
ISBN: 705-2-74226-883-8
Downloads: 68454
Price: Free* [*Free Regsitration Required]
Uploader: Vokasa

The upper spreader stowing guide makes it easy to connect guy cables. Massive and Versatile Lifting Performance 2. The primary stop function is activated when the boom or tower approaches the critical angle-toground during hoisting. kobelxo

Klbelco is also possible to transport with boom base. Design Side-Engine Layout for Easy Maintenance A new engine layout on the side of the machine provides easy access for routine inspections and servicing. The Online Industrial Exhibition. Long boom length Safe,Environmentally-Conscious Design Photos in this catalogue may include optional items. The replacement cycle is extended to four times longer than that of conventional filters to reduce lifelong operating costs. Open the catalog to page 5.

TOP Related Posts  AN INTRODUCTION TO MODERN COSMOLOGY LIDDLE PDF

Excellent Transportability and Assembly 5.

To ensure safe assembly and increase actual working hours Excellent Transportability and Assembly Base Machine Width of 3. Open the catalog to page 2.

Excellent transportation features enable The rated load, actual load, load ratio, and other information are displayed in large kobelcoo.

Open the catalog to page 7. The perfect answer comes in our new This new system monitors the angle-to-ground of the boom, tower or tower jib with a sensor, and swiftly alerts the operator of danger.

Open the catalog to page 6.

hydraulic crawler cranes – Kobelco Cranes – PDF Catalogs | Technical Documentation | Brochure

Excellent Cab with Enhanced Functions 4. Open the catalog to page 8.

The long boom can be made up of insert boom and mobelco insert jib, to make economic use of attachment kovelco. Open the catalog to page Hoist winches with powerful linepull are designed to handle the toughest jobs. This also ensures that the guy cables are correctly installed during assembly optional.

TOP Related Posts  ENRIQUE CHAIJ PDF

This is completely interference-free hydraulic circuit to perform smooth combined operation of This enables the machine with axles to be transported on a trailer. For the tower, the angle-to-machine is also monitored Open the catalog to page 4.

For greater work efficiency Smooth Operation and Control New Hydraulic System Improves Simultaneous Operations In case of luffing tower operation, the aux winch is used for jib hoisting.

Maintenance crews can access the entire power plant just by opening the side door. Smooth Operation and Control 3. The stowing bracket makes securely tighten the guy cables on to boom inserts for transportation. Open the catalog to page 9. Warnings and other items are displayed in color, and text messages kobeldo alarms alert the operator to prevent dangerous 7520 from developing.

The width and weight is within 3. Hydraulic Crawler Crane 5 Major Features 1.

Trading Business – Kobelco / 7250-2F

Other information can also be displayed, including a rated load chart and rated load curve, in addition to a function that regulates the working Precision and high-elevation crane jobs depend on accuracy and speed, whereas heavy-lifting depends on trustworthy power and strength.

TOP Related Posts  ALCIATI EMBLEMATUM LIBER PDF

Large drum capacities combined with a new hydraulic system promote ultra-smooth operation. Super Fine Filter, a Long-Life Filter for Hydraulic Oil The large-capacity, super-fine filter is made of a high-performance filter medium consisting of glass fiber reinforced with steel wires. This eliminates installation of boom base and boom hoist rope in jobsite, swiftly The adopts one-pump to one-motor kobepco independent hydraulic circuit for main, aux hoist and boom hoist.

This results in lower labor and assist-crane costs, and greater productivity on the job.